Las Posadas Shear Zone Future Plans
  • Infill and extension drilling as required
  • Bulk acid leach metallurgical testing
  • Pre-feasibility, environmental baseline, permitting, engineering and infrastructure relocation studies
  • Revised (43-101) resource estimate
Other Shear Zones
  • Drilling of identified targets to define additional resources
  • Detailed mapping to define additional drill targets
Rabbit South Future Plans
  • Infill drilling as required
  • Resource calculations and 3D modeling
  • Scoping study to determine project economics
  • Additional drilling and exploration to further define resource